JGH Solar designed, supplied all the materials and completed installation of a 300kWp with 1000kWh Solar back-up PV Power plant for the Medical Provincial Warehouse in Luanda, Angola.
During 2018, JGH Solar designed, supplied all the materials and completed installation of a 300kWp with 1000kWh Solar back-up PV Power plant for the Medical Provincial Warehouse in Luanda, Angola.
As a part of the project, JGH Solar also did training and will be performing maintenance for 3 years.
The project was a part of the UNDP Frame contract for “Solar for Health”, which assists the world’s hotspots with sustainable power for schools, small clinics, hospitals and medical warehouses.
In February 2019 JGH Group handed over the solar power plant successfully to the local authorities in Luanda, Angola.
Details of the project:
- Project: 300kWp with 1000kWh Solar back-up PV Power Plant for the Medical Provincial Warehouse in Luanda, Angola
- Client: United Nations Developement Programme (UNDP)
- Place: Suburbs of Luanda, Angola
- Funded by: UNPD
- Status: Project handover in February 2019